Site Investigation and Risk Assessment of a Landfill Site
Download a pdf file containing examples of four case studies
If you do not have the software to view this, a PDF Reader can be downloaded for free directly from Adobe®
Problem
A leading international cement and aggregate provider were concerned about the environmental liability associated with a cement plant located in the Balkans, as there was a landfill site near the plant which had been used to dump various wastes over the years. The company had purchased the cement plant from the state and as a result they had inherited the environmental liabilities associated with the site. A local environmental company had carried out a superficial site investigation which identified potential contamination at the site and as a result the company were very concerned about any future environmental implications.Solution
Remedios carried out a detailed risk assessment of the soil and groundwater samples. The results of the soil and groundwater risk assessments showed that there was minimal contamination in the site and groundwater samples. Remedios produced a report that was compliant with UK legislation (in the absence of local legislation). Remedios visited the site and presented the results of the report and submitted recommendations as to the way forward. Due to the nature of the site Remedios recommended that routine monitoring of the existing boreholes should be carried out in order to be proactive in terms of any future liability and demonstrate best practice.Outcome
Remedios delivered a bespoke solution to client which limited the environmental liability associated with a potentially polluting site. By assessing risks in a methodical manner, Remedios were able design and implement an investigation strategy that directly assessed the conditions at the landfill site. By providing training to the site staff and remotely project managing monitoring events, Remedios were able to provide a cost effective solution to the client. The client now feels as though they have this particular "environmental worry" under control and they are much more comfortable about it. serbian-case-study.pdf (255 Kbytes)Return to Case Studies